Skip to main content
County Web Accessibility information including Alternative Format Requests for Disabled Users are provided on this page.

Press Releases - Department of Transportation

MDOT SHA Major Planned Major Weekend Lane Closure Update (01/26/18 – 01/29/18)

For Immediate Release: Friday, January 26, 2018


Major Weekend Lane Closures

 

Anne Arundel County

 

  • US 50 on the Severn River Bridge Lane widening project – Single lane closures 7 days a week – Single lane closures 7 p.m. and 5 a.m. (double lanes 11 p.m. until 5 a.m.)

     

  • Inner loop of I-695 at the Curtis Creek Drawbridge Drawbridge repair(MDTA project) Inner loop I-695 closed and traffic in two-way operation using the outer loop of I-695 until November 2018.

Baltimore County

 

  • Edmonson Avenue ramp to the outer loop of I-695 Highway widening project – Ramp to be CLOSED and detoured beginning 9 p.m. Friday until 5 a.m. Monday. Motorists will be directed to Ingleside Avenue to US 40 (Baltimore National Pike) to I-695.

  • Warren Road Bridge (ramp) over I-83 Routine bridge inspection – Single lane closures Saturday between 4 a.m. and 12 noon. New

     

  • Cold Bottom Road Bridge over I-83 Routine bridge inspection – Single lane closures Sunday between 4 a.m. and 12 noon. new

Montgomery County

 

  • Shady Grove Road Bridge over I-270 Routine bridge inspection – Double lane closures Saturday between 4 a.m. and 12 noon. New

     

  • Montrose Road Bridge over I-270 Routine bridge inspection – Single lane closures Sunday between 4 a.m. and 12 noon. new

  • Inner and outer loop of I-495 (Capital Beltway) between MD 97 (Georgia Avenue) and MD 185 (Connecticut Avenue)Seminary Road bridge rehabilitation project – Occasional single lane closures Sunday nights through Friday mornings between 9 p.m. and 5 a.m.

 

  • MD 355 (Wisconsin Avenue) between Waverly Street and Willow Lane (at 7272 Wisconsin Avenue) - Private /commercial demolition/construction project - Intermittent southbound lane closures with sidewalk closures Mondays through Fridays between 9 a.m. and 3 p.m. and/or Sunday nights to Friday mornings between 9 p.m. and 5 a.m.

     

 

Long-Term Closures

 

Carroll County

 

A look ahead at next week

Baltimore County

 

  • I-83 (Baltimore-Harrisburg Expressway) at MD 137 (Mt. Carmel Road) Bridge replacement project – Occasional single lane closures Mondays through Fridays between 9 a.m. and 3 p.m. 

Montgomery County

 

  • Northbound MD 355 (Wisconsin Avenue) between Stanford Street and Walsh Avenue - Private/commercial crane operation - Double lane closures on Saturday, February 3, from 7 a.m. to 7 p.m.  new

     

  • Southbound MD 355 (Wisconsin Avenue) between Elm Street and Bethesda AvenueBuilding demolition– Single lane closures Sunday nights through Friday mornings between 9 p.m. and 5 a.m.

     

Prince George’s County

 

  • MD 208 (Hamilton Street) between Ager Road and 38th Street - Private commercial water main replacement project - Single lane closures Mondays through Fridays between 9 a.m. and 3 p.m.

 

Washington County

 

  • I-81 at the MD 63/MD 68 Bridge – Highway and bridge widening – Single lane closures Sunday nights through Friday mornings between 9 p.m. and 5 a.m.

     

  • I-70 at MD 65 (Sharpsburg Pike) – Soil boring work – Occasional single lane closures Sunday nights through Friday mornings between 9 p.m. and 5 a.m. new

 

Worcester County

  • MD 528 (Coastal Highway) between 26th Street and 62nd Street Median fence construction – Left lane closed in each direction 24/7. Left turn lane access is maintained.

Release ID: 18-020
Media Contact: Christopher Bishop 410-545-0300

All MCDOT News Releases


people using various transportation modes people using various transportation modes