Skip to main content
County Web Accessibility information including Alternative Format Requests for Disabled Users are provided on this page.

Press Releases - Department of Transportation

Expect Temporary Road Closures on MD 355/Rockville Pike in Bethesda January 27 - 31

For Immediate Release: Friday, January 24, 2020

From 9 p.m. Friday, January 24, through 11 p.m. Saturday, January 25, the two right southbound lanes on MD 355/Rockville Pike at South Drive will be closed for storm drain installation.

From 9 a.m. Monday, January 27, through 3 p.m. Friday, January 31, the right southbound lane on MD 355/Rockville Pike at Center Drive will be closed for curb installation.

Construction activity inside the Medical Center Metro Station has begun and will continue through fall 2020.

  • En Espanol
  • View the handout flyer in English and Spanish.
  • Two new Metro entrance elevators are being constructed on the Navy Side of Rockville Pike, along with a connecting passageway from the mezzanine level to the new elevators to serve passengers to and from the Walter Reed/Naval Support Activity Bethesda.
  • All construction activities within the station will take place behind or within partitioned areas on the platform and mezzanine levels and will be performed during non-service hours. Work is not expected to impede access to or inside the station. 

Project completion is anticipated in Fall 2020.

View map of the Rockville Pike/Jones Bridge Road/Woodmont Ave Intersection.


About the Crossing Project:

This work is part of the ongoing construction of the Crossing Project at the Medical Center Metro Station, near the Medical Center Metro Station, National Institutes of Health (NIH) and the Walter Reed National Military Medical Center at Naval Support Activity Bethesda. When it is completed in Fall 2020, the Crossing Project will enhance safety and mobility for people and vehicles moving through this heavily trafficked area. 

 

The Crossing Project has two main components: 1) A shallow pedestrian underpass connecting Naval Support Activity Bethesda/Walter Reed National Military Medical Center on the east side of Rockville Pike to NIH and the bus/commuter transit center on the west side; and 2) Deep elevators on the Navy side of Rockville Pike to the Metrorail mezzanine. 

 

In addition, the Crossing Project includes pedestrian safety, traffic and transit improvements to the nearby intersections of MD 355 (Rockville Pike) at Jones Bridge Road and Center Drive (at NIH), and at MD 355 and Woodmont Avenue. 

 

View map of the Crossing Project construction area.
View pictures of the construction and of signs for safe pedestrian/cycling detours.
View video to see what’s happening underground.

 

For more information, visit md355crossing.com.


A Safety Reminder:

As construction of the Crossing Project at the Medical Center Metro Station moves forward, the Montgomery County Dept. of Transportation (MCDOT) urges people to exercise caution as they walk, bike or travel near the construction zone. Please pay attention to all signs that have been posted for your safety. Walk or bike only on designated crosswalks, sidewalks and paths.

In the meantime, MCDOT appreciates the patience of everyone who lives, works or travels through the area.

 

Release ID: 20-016
Media Contact: Hannah Henn 240-777-8389

All MCDOT News Releases


people using various transportation modes people using various transportation modes